CategorySCHEDULED ROADWORK, null, Planned
Advice

Reduced speed limit

Allow extra travel time

Work will be carried out between 6am and 6pm every weekday and between 6am and 5pm every second Saturday.

Single-lane closures will be in place. Alternating (stop/slow) traffic conditions will be in place to allow motorists to pass in one direction at a time.

Traffic controllers will be on-site to direct motorists.

Residents within the work area will have access to their properties at all times under the guidance of traffic controllers. Emergency service providers and deliveries to the village will also be maintained.

Motorists are advised to allow approximately 10 minutes of additional travel time.

Speed Limit40
Schedule

Affected

Both directions

Weekdays - (6:00am - 6:00pm)

Affected

Both directions

Saturday - (6:00am - 5:00pm)

RoadsPrinces Highway, Green Point Road, Pambula, Stringybark Place

View more details

Location: (-36.9079992, 149.8745232)

CategorySCHEDULED ROADWORK, null, Planned
Advice

Reduced speed limit

Check signage

Single-lane closures will be in place.

Portable traffic lights will allow motorists to pass in one direction at a time.

Motorists are advised to allow approximately 5 minutes of additional travel time.

Speed Limit40
Schedule

Affected

Both directions

Every Day - (all day - )

RoadsSnowy Mountains Highway, Brown Mountain, Bemboka

View more details

Location: (-36.6099327, 149.4689089)

CategorySCHEDULED ROADWORK, null, Planned
Advice

Allow extra travel time

Check signage

Road resurfacing works. Traffic controllers will be on site to direct motorists.

Schedule

Affected

All directions

Every Day - (all day - )

RoadsStorey Avenue, Ben Boyd Drive, Eden, Princes Highway
OrganisationBega Valley Shire Council
02 6499 2222
council@begavalley.nsw.gov.au
http://www.begavalley.nsw.gov.au

View more details

Location: (-37.0435527, 149.897357)

CategoryHAZARD, null, Unplanned
Advice

Use an alternative route

Use diversions

A section of Pericoe Road, Yambulla is closed due to severe erosion of pavement.

The alternate connecting route between Pericoe Road and Imlay Road is via Falkner Road and Gecko Road.

This temporary road closure will be in place until further notice.

Diversions

The alternate connecting route between Pericoe Road and Imlay Road is via Falkner Road and Gecko Road.

RoadsPericoe Road, Falkner Road, Yambulla, Gecko Road
OrganisationBega Valley Shire Council
02 6499 2222
council@begavalley.nsw.gov.au
http://www.begavalley.nsw.gov.au

View more details

Location: (-37.1288432, 149.5282629)

CategorySCHEDULED ROADWORK, null, Planned
Advice

Allow extra travel time

Expect delays

Roadworks on Andy Poole Drive between Bushlark Lane and Bega Street. Traffic controllers will be on site to direct motorists.

Speed Limit40
Schedule

Affected

All directions

Every Day - (7:00am - 5:00pm)

RoadsAndy Poole Drive, Bushlark Lane, Tathra, Bega Street
OrganisationBega Valley Shire Council
02 6499 2222
council@begavalley.nsw.gov.au
http://www.begavalley.nsw.gov.au

View more details

Location: (-36.7290397, 149.9835139)

CategorySCHEDULED ROADWORK, null, Planned
Advice

Allow extra travel time

Expect delays

Contractors will be carrying out road stabilisation works between the Thompson Drive intersection and approximately 100 metres west of Killarney Road. Traffic controllers will be on site to direct motorists.

Speed Limit40
Schedule

Affected

All directions

Every Day - (all day - )

RoadsTathra Road, Thompson Drive, Tathra, Killarney Road
OrganisationBega Valley Shire Council
02 6499 2222
council@begavalley.nsw.gov.au
http://www.begavalley.nsw.gov.au

View more details

Location: (-36.7349515, 149.9674323)

CategorySCHEDULED ROADWORK, null, Planned
Advice

Check signage

Expect delays

Bega Valley Shire Council advises kerb and gutter repair works will be carried out on Quondola Street parking lanes in Pambula, from Monday 24 March to Friday 11 April, weather permitting.

Council is collaborating with Transport for NSW for these works as they deliver improvements to the Princes Highway.

Local contractors will be carrying out the works between 7am and 5pm each day. Works are expected to affect up to seven car parking spaces at a time. Night works may occur to minimise the impact to businesses.

Traffic control will be in place and road users should expect some delays.

Schedule

Affected

All directions

Every Day - (all day - )

RoadsQuondola Street, Pambula
OrganisationBega Valley Shire Council
02 6499 2222
council@begavalley.nsw.gov.au
http://www.begavalley.nsw.gov.au

View more details

Location: (-36.9297094, 149.8745295)

CategoryHAZARD, Road damage, Unplanned
Advice

Use an alternative route

Plan your journey

Road closed due to road damage and will remain closed until mid-2025. Works to repair the road will be carried out from Monday 7 April to Friday 6 June., weather permitting.

RoadsOld Wallagoot Road, Kalaru, Kalaru, Penuca Road
OrganisationBega Valley Shire Council
02 6499 2222
council@begavalley.nsw.gov.au
http://www.begavalley.nsw.gov.au

View more details

Location: (-36.742769, 149.933297)

CategorySCHEDULED ROADWORK, null, Planned
Advice

Expect delays

Check signage

Road reseal works scheduled for Moorehead Street and Young Street, Eden, weather permitting. Traffic controllers will be on site to direct motorists.

Schedule

Affected

All directions

Tuesday - (6:00am - 6:00pm)

RoadsMoorhead Street, Young Street, Eden
OrganisationBega Valley Shire Council
02 6499 2222
council@begavalley.nsw.gov.au
http://www.begavalley.nsw.gov.au

View more details

Location: (-37.0490504, 149.8987175)

CategorySCHEDULED ROADWORK, null, Planned
Advice

Expect delays

Check signage

Road reseal works scheduled for Calle Calle Street and Maling Street, Eden, weather permitting. Traffic controllers will be on site to direct motorists.

Schedule

Affected

All directions

Tuesday - (6:00am - 6:00pm)

RoadsMaling Street, Calle Calle Street, Eden
OrganisationBega Valley Shire Council
02 6499 2222
council@begavalley.nsw.gov.au
http://www.begavalley.nsw.gov.au

View more details

Location: (-37.0616114, 149.9070617)

CategorySCHEDULED ROADWORK, null, Planned
Advice

Expect delays

Check signage

Road reseal works scheduled for Resevoir and Curalo Street, Eden, weather permitting. Traffic controllers will be on site to direct motorists.

Schedule

Affected

All directions

Wednesday - (6:00am - 6:00pm)

RoadsReservoir Street, Curalo Street, Eden
OrganisationBega Valley Shire Council
02 6499 2222
council@begavalley.nsw.gov.au
http://www.begavalley.nsw.gov.au

View more details

Location: (-37.0526853, 149.9008197)

CategorySCHEDULED ROADWORK, null, Planned
Advice

Expect delays

Check signage

Road reseal works scheduled for Flinders Street and Bungo Street, Eden, weather permitting. Traffic controllers will be on site to direct motorists.

Schedule

Affected

All directions

Wednesday - (6:00am - 6:00pm)

RoadsBungo Street, Flinders Street, Eden
OrganisationBega Valley Shire Council
02 6499 2222
council@begavalley.nsw.gov.au
http://www.begavalley.nsw.gov.au

View more details

Location: (-37.061725, 149.901386)

CategorySCHEDULED ROADWORK, null, Planned
Advice

Check signage

Expect delays

Flood restoration works on Towamba Road. The site is located near the intersection of Towamba Road and Ben Boyd Road, about 14 kilometres from the Princes Highway, south of Eden.


Stage 1 - Monday 31 March to Friday 18 April

A single lane with portable traffic lights will be open from 6:30am to 9am and 3pm to 6pm, Monday to Saturday. Expect delays of up to 30 minutes during these times. The road will be fully closed outside these hours, including overnight and from 9am to 3pm, Monday to Saturday. During this stage, the first 30 meters of the retaining wall will be built and backfilled.


Stage 2 - Friday 18 April (afternoon) to Monday 28 April (morning)

A single lane with portable traffic lights will remain open to allow light vehicles only to pass in one direction at a time. Road users should expect delays of up to 15 minutes during these times. During the Easter Holidays, no work will be completed and a 5T gross limit will be in place with restrictions to caravans and trailers.


Stage 3 - Monday 28 April to Friday 30 May

A single lane with portable traffic lights will remain open to allow road users to pass in one direction at a time between 6:30am to 9am and from 3:00pm to 6:00pm Monday to Saturday. Road users should expect delays of up to 30 minutes during these times.

The road will be under a full closure outside of these hours including overnight and between 9:00am to 3:00pm Monday to Saturday. During this stage the final 30 metre section of the retaining wall will be built, backfilled and the road surface resealed.


Diversions

During periods of full closure, the recommended detour is via Burragate Road and Mount Darragh Road.

Schedule

Affected

Both directions

Every Day - (6:30am - 6:00pm)

RoadsTowamba Road, Ben Boyd Road, Towamba
OrganisationBega Valley Shire Council
02 6499 2222
council@begavalley.nsw.gov.au
http://www.begavalley.nsw.gov.au

View more details

Location: (-37.104411, 149.763889)

CategoryHAZARD, null, Unplanned
Advice

Exercise caution

Road damage due to flooding,

RoadsTarlingtons Lane, Tantawangalo Creek, Mogilla
OrganisationBega Valley Shire Council
02 6499 2222
council@begavalley.nsw.gov.au
http://www.begavalley.nsw.gov.au

View more details

Location: (-36.7464484, 149.6381127)

No Traffic Cameras to display

No Road Closures to display