Road and Bridge Conditions
Map (List View)
Category | SCHEDULED ROADWORK, null, Planned |
Advice | Reduced speed limit Allow extra travel time Work will be carried out between 6am and 6pm every weekday and between 6am and 5pm every second Saturday. Single-lane closures will be in place. Alternating (stop/slow) traffic conditions will be in place to allow motorists to pass in one direction at a time. Traffic controllers will be on-site to direct motorists. Residents within the work area will have access to their properties at all times under the guidance of traffic controllers. Emergency service providers and deliveries to the village will also be maintained. Motorists are advised to allow approximately 10 minutes of additional travel time. |
Speed Limit | 40 |
Schedule | Affected Both directions Weekdays - (6:00am - 6:00pm) Affected Both directions Saturday - (6:00am - 5:00pm) |
Roads | Princes Highway, Green Point Road, Pambula, Stringybark Place |
View more details
Location: (-36.9079992, 149.8745232)
Category | SCHEDULED ROADWORK, null, Planned |
Advice | Reduced speed limit Check signage Single-lane closures will be in place. Portable traffic lights will allow motorists to pass in one direction at a time. Motorists are advised to allow approximately 5 minutes of additional travel time. |
Speed Limit | 40 |
Schedule | Affected Both directions Every Day - (all day - ) |
Roads | Snowy Mountains Highway, Brown Mountain, Bemboka |
View more details
Location: (-36.6099327, 149.4689089)
Category | SCHEDULED ROADWORK, null, Planned |
Advice | Allow extra travel time Check signage Road resurfacing works. Traffic controllers will be on site to direct motorists. |
Schedule | Affected All directions Every Day - (all day - ) |
Roads | Storey Avenue, Ben Boyd Drive, Eden, Princes Highway |
Organisation | Bega Valley Shire Council 02 6499 2222 council@begavalley.nsw.gov.au http://www.begavalley.nsw.gov.au |
View more details
Location: (-37.0435527, 149.897357)
Category | HAZARD, null, Unplanned |
Advice | Use an alternative route Use diversions A section of Pericoe Road, Yambulla is closed due to severe erosion of pavement. The alternate connecting route between Pericoe Road and Imlay Road is via Falkner Road and Gecko Road. This temporary road closure will be in place until further notice. |
Diversions | The alternate connecting route between Pericoe Road and Imlay Road is via Falkner Road and Gecko Road. |
Roads | Pericoe Road, Falkner Road, Yambulla, Gecko Road |
Organisation | Bega Valley Shire Council 02 6499 2222 council@begavalley.nsw.gov.au http://www.begavalley.nsw.gov.au |
View more details
Location: (-37.1288432, 149.5282629)
Category | SCHEDULED ROADWORK, null, Planned |
Advice | Allow extra travel time Expect delays Roadworks on Andy Poole Drive between Bushlark Lane and Bega Street. Traffic controllers will be on site to direct motorists. |
Speed Limit | 40 |
Schedule | Affected All directions Every Day - (7:00am - 5:00pm) |
Roads | Andy Poole Drive, Bushlark Lane, Tathra, Bega Street |
Organisation | Bega Valley Shire Council 02 6499 2222 council@begavalley.nsw.gov.au http://www.begavalley.nsw.gov.au |
View more details
Location: (-36.7290397, 149.9835139)
Category | SCHEDULED ROADWORK, null, Planned |
Advice | Allow extra travel time Expect delays Contractors will be carrying out road stabilisation works between the Thompson Drive intersection and approximately 100 metres west of Killarney Road. Traffic controllers will be on site to direct motorists. |
Speed Limit | 40 |
Schedule | Affected All directions Every Day - (all day - ) |
Roads | Tathra Road, Thompson Drive, Tathra, Killarney Road |
Organisation | Bega Valley Shire Council 02 6499 2222 council@begavalley.nsw.gov.au http://www.begavalley.nsw.gov.au |
View more details
Location: (-36.7349515, 149.9674323)
Category | SCHEDULED ROADWORK, null, Planned |
Advice | Check signage Expect delays Bega Valley Shire Council advises kerb and gutter repair works will be carried out on Quondola Street parking lanes in Pambula, from Monday 24 March to Friday 11 April, weather permitting. Council is collaborating with Transport for NSW for these works as they deliver improvements to the Princes Highway. Local contractors will be carrying out the works between 7am and 5pm each day. Works are expected to affect up to seven car parking spaces at a time. Night works may occur to minimise the impact to businesses. Traffic control will be in place and road users should expect some delays. |
Schedule | Affected All directions Every Day - (all day - ) |
Roads | Quondola Street, Pambula |
Organisation | Bega Valley Shire Council 02 6499 2222 council@begavalley.nsw.gov.au http://www.begavalley.nsw.gov.au |
View more details
Location: (-36.9297094, 149.8745295)
Category | HAZARD, Road damage, Unplanned |
Advice | Use an alternative route Plan your journey Road closed due to road damage and will remain closed until mid-2025. Works to repair the road will be carried out from Monday 7 April to Friday 6 June., weather permitting. |
Roads | Old Wallagoot Road, Kalaru, Kalaru, Penuca Road |
Organisation | Bega Valley Shire Council 02 6499 2222 council@begavalley.nsw.gov.au http://www.begavalley.nsw.gov.au |
View more details
Location: (-36.742769, 149.933297)
Category | SCHEDULED ROADWORK, null, Planned |
Advice | Expect delays Check signage Road reseal works scheduled for Moorehead Street and Young Street, Eden, weather permitting. Traffic controllers will be on site to direct motorists. |
Schedule | Affected All directions Tuesday - (6:00am - 6:00pm) |
Roads | Moorhead Street, Young Street, Eden |
Organisation | Bega Valley Shire Council 02 6499 2222 council@begavalley.nsw.gov.au http://www.begavalley.nsw.gov.au |
View more details
Location: (-37.0490504, 149.8987175)
Category | SCHEDULED ROADWORK, null, Planned |
Advice | Expect delays Check signage Road reseal works scheduled for Calle Calle Street and Maling Street, Eden, weather permitting. Traffic controllers will be on site to direct motorists. |
Schedule | Affected All directions Tuesday - (6:00am - 6:00pm) |
Roads | Maling Street, Calle Calle Street, Eden |
Organisation | Bega Valley Shire Council 02 6499 2222 council@begavalley.nsw.gov.au http://www.begavalley.nsw.gov.au |
View more details
Location: (-37.0616114, 149.9070617)
Category | SCHEDULED ROADWORK, null, Planned |
Advice | Expect delays Check signage Road reseal works scheduled for Resevoir and Curalo Street, Eden, weather permitting. Traffic controllers will be on site to direct motorists. |
Schedule | Affected All directions Wednesday - (6:00am - 6:00pm) |
Roads | Reservoir Street, Curalo Street, Eden |
Organisation | Bega Valley Shire Council 02 6499 2222 council@begavalley.nsw.gov.au http://www.begavalley.nsw.gov.au |
View more details
Location: (-37.0526853, 149.9008197)
Category | SCHEDULED ROADWORK, null, Planned |
Advice | Expect delays Check signage Road reseal works scheduled for Flinders Street and Bungo Street, Eden, weather permitting. Traffic controllers will be on site to direct motorists. |
Schedule | Affected All directions Wednesday - (6:00am - 6:00pm) |
Roads | Bungo Street, Flinders Street, Eden |
Organisation | Bega Valley Shire Council 02 6499 2222 council@begavalley.nsw.gov.au http://www.begavalley.nsw.gov.au |
View more details
Location: (-37.061725, 149.901386)
Category | SCHEDULED ROADWORK, null, Planned |
Advice | Check signage Expect delays Flood restoration works on Towamba Road. The site is located near the intersection of Towamba Road and Ben Boyd Road, about 14 kilometres from the Princes Highway, south of Eden. Stage 1 - Monday 31 March to Friday 18 April A single lane with portable traffic lights will be open from 6:30am to 9am and 3pm to 6pm, Monday to Saturday. Expect delays of up to 30 minutes during these times. The road will be fully closed outside these hours, including overnight and from 9am to 3pm, Monday to Saturday. During this stage, the first 30 meters of the retaining wall will be built and backfilled. Stage 2 - Friday 18 April (afternoon) to Monday 28 April (morning) A single lane with portable traffic lights will remain open to allow light vehicles only to pass in one direction at a time. Road users should expect delays of up to 15 minutes during these times. During the Easter Holidays, no work will be completed and a 5T gross limit will be in place with restrictions to caravans and trailers. Stage 3 - Monday 28 April to Friday 30 May A single lane with portable traffic lights will remain open to allow road users to pass in one direction at a time between 6:30am to 9am and from 3:00pm to 6:00pm Monday to Saturday. Road users should expect delays of up to 30 minutes during these times. The road will be under a full closure outside of these hours including overnight and between 9:00am to 3:00pm Monday to Saturday. During this stage the final 30 metre section of the retaining wall will be built, backfilled and the road surface resealed. |
Diversions | During periods of full closure, the recommended detour is via Burragate Road and Mount Darragh Road. |
Schedule | Affected Both directions Every Day - (6:30am - 6:00pm) |
Roads | Towamba Road, Ben Boyd Road, Towamba |
Organisation | Bega Valley Shire Council 02 6499 2222 council@begavalley.nsw.gov.au http://www.begavalley.nsw.gov.au |
View more details
Location: (-37.104411, 149.763889)
Category | HAZARD, null, Unplanned |
Advice | Exercise caution Road damage due to flooding, |
Roads | Tarlingtons Lane, Tantawangalo Creek, Mogilla |
Organisation | Bega Valley Shire Council 02 6499 2222 council@begavalley.nsw.gov.au http://www.begavalley.nsw.gov.au |
View more details
Location: (-36.7464484, 149.6381127)
No Traffic Cameras to display
No Road Closures to display
Data Authority: Transport NSW
Checked 5 minutes ago